Projects

parallax background
  • 1- Design, Material Supply and Fabrication of Water Injector Package for Pardis 3 rd Ammonia & Urea Project, Finished (2014)
  • 2- Material Supply and Fabrication of Process Equipment Anchor Bolts for Lordegan Ammonia & Urea Project, Finished (2015)
  • 3- Design, Material Supply and Fabrication of Injection Package for Abadan Refinery Unit-80 Desalting System Project, Finished (2015)
  • 4- Material Supply and Fabrication of Coupling for Urea Warehouse of Lordegan Ammonia & Urea Project, Finished (2015)
  • 5- Material Supply and Fabrication of Head Structure of Bag Filter for Kowsar Cement Company, Finished (2015)
  • 6- Material Supply and Fabrication of Butane and Propane Cryogenic Storage Tank Perlite Block (Bottom Insulation) for PARSIAN C2+ Recovery & Fractionation Project, Finished (2016)
  • 7- Design, Material Supply and Fabrication of Urea Granulation & Mis. Steel Structure, C.S./S.S. Duct & Grating (Over 2500MT) for Lordegan Ammonia & Urea Project, (2016)
  • 8- Material Supply and Fabrication of Butane and Propane Cryogenic Storage Tank Anchor Strap for PARSIAN C2+ Recovery & Fractionation Project, Finished (2016)
  • 9- Material Supply and Fabrication of Process Equipment Anchor Bolts for Bushehr Petrochemical Complex, Utility 1, 2, 3 Project, , Finished (2016)
  • 10- Material Supply and Fabrication of Process Equipment Anchor Bolts for Bushehr Petrochemical Complex, Olefin Project, , Finished (2016)
  • 11- Material Supply of Butane and Propane Cryogenic Storage Tank Cellular Glass (Bottom Insulation) for PARSIAN C2+ Recovery & Fractionation Project, Finished (2016)
  • 12- Design, Material Supply and Fabrication of Butane and Propane Cryogenic Storage Tank Bitumen Damp Proof Course (Bottom Insulation) for PARSIAN C2+ Recovery & Fractionation Project, Finished (2016)
  • 13- Design and Material Supply of Insulation (Bottom/Shell/Roof) for Butane and Propane Cryogenic Storage Tank for PARSIAN C2+ Recovery & Fractionation Project, (2017)